The short version
- When a buyer asks your day rate, they already have a budget. Your answer divides it into days, and that becomes the length of the project.
- Nobody checks whether the work fits. When it doesn't, the client carries all the risk and you still get paid. That's how good engagements turn sour around day 40.
- A day rate also files you next to the plumber: hired help, not judgement.
- Say "I don't have one", give the reason, and talk about the outcome, the elapsed time and a fixed price.
- Keep a day rate privately, as your floor. Just never let it be the client's business.
The sum nobody does out loud
Here's a thing nobody tells you when you leave corporate life. When a buyer asks for your day rate, they've already got a budget in their head. They know what they can safely spend before you've opened your mouth.
So they ask. You say £1,000 a day. They have £20,000. And in the time it takes you to sip your coffee, the project has become 20 days long.
Nobody decided that. Nobody looked at the work. A division sum did it, quietly, in the buyer's head. And it doesn't take a genius. Even the most dim-witted chief executive on the planet can manage big number divided by small number.
Scale it up and it gets sillier. I say a thousand pounds a day; you walked in with sixty grand in mind. Congratulations, we've both just agreed to a sixty-day project. Which is bonkers, because neither of us has said a single word about what the sixty days are for.
That's the whole problem in one move. The length of your engagement is set before anyone has asked what the work is. Everything that goes wrong later starts right here.
Why it goes wrong on day 40
If the work happens to fit the days the sum produced, brilliant. That's luck. Most of the time it doesn't, and you can almost set your watch by what happens next.
I come in, I start working, you start paying. Day 40, you get a little bit nervous. Day 50, really nervous. Day 60 comes and goes, because it was never an accurate number in the first place. By day 80 you're really quite p*y about the whole thing, and I'm the person you're p*y with.
And me? I still get paid. Every single day.
That's the bit people don't say out loud. On a day rate, the client carries all of the risk. If the work takes four days, I get paid. If it takes forty, I get paid. The client is the only one who loses when it runs over, and they know it, and they feel it every time they sign off another week.
There's a second, sneakier problem. A day rate punishes you for being good. Finish fast and you earn less. Let it drag and you earn more. Nobody would design a reward system like that on purpose, yet thousands of very capable people run their whole practice on it.
As far as I'm concerned, a day-rate engagement is set up to fail from day one. Unless, by some pure stroke of luck, the work fits inside the window, somebody's going to end up unhappy along the way. Usually both of you.
The year-two penny drop
I answered the day rate question for years before I saw what it was doing to me.
It was my second year of consulting. I realised I was creating engagements with a fixed length every time I opened my mouth. I never knew the client's budget from the outset. The client never knew my day rate. We were both guessing, and the day rate filled the gap between our guesses. Entirely the wrong way to set a project up for success.
Once I'd seen it, I couldn't unsee it, and it changed the conversation completely. Instead of "my rate is X", I started saying things like:
"You're thinking £20,000. What if it's £40,000? What if it actually just takes £40,000? What if I priced it at £30,000 fixed?"
Notice what that does. It's a conversation about the work: what it'll really take, what it's really worth. The day rate version is a conversation about my time, and frankly my time isn't that interesting to anybody but me.
A day rate makes you hired help
The deeper problem isn't the maths. It's what a day rate says about you.
When you charge by the hour or by the day, you become a cost line. My plumber charges me by the hour. Lovely bloke, excellent at what he does. But I don't phone him and ask what he thinks about our strategy for next year. I phone him and ask him to come and fix the leak. He's hired help, and a day rate makes you hired help too.
Fractional work only pays properly when the client is buying your judgement. And once a client has filed you under hired help, it's very hard to climb back out. You'll be the person they call to do things, not the person they call to decide things.
A day rate also hides what the work really costs you. A "day" is never a day. There's the spin-up before it, the wind-down after it, the thinking you do in the shower. A week of day-rate work costs you a week and a half at best, often two. Price it at the base rate and you're underpricing yourself by about 40%, every single time.
And here's the one that surprised me most. When I worked on day rates, other clients were something to hide. I'd find myself skulking around corridors and nipping into side rooms to take other clients' calls on the quiet, all very hush-hush, like I was having an affair. When I moved away from day rates, that stopped overnight. Nobody expected me to be theirs exclusively anymore. Working with three or four clients at once became perfectly normal, which, let's be honest, is the entire point of going fractional.
If you're still working out where fractional ends and contracting begins, fractional versus contracting sets the line out in full.
| Day rate | Fixed price for the outcome | |
|---|---|---|
| Who sets the length of the project? | A division sum | The work |
| Who carries the risk if it runs over? | The client | You, partly |
| What happens if you work fast? | You earn less | You earn more |
| How the client sees you | Hired help | Someone whose judgement they buy |
| What the client actually gets | A number of days | Cost certainty |
What to say instead
So the question comes. What do you actually say?
You say: "I don't have one." Calmly. Looking them square in the eye. And then, crucially, you stop talking for a second.
It feels terrifying the first time. It gets easier. And the reason you give matters, because it's about them, not you: it has never sat well with me that the client carries all of the risk. It isn't a good way to start a relationship. I'd rather carry some of it.
So I price the outcome. We agree it's a sensible amount of money for what the work delivers. Then it's down to me to get the job done. If I move fast, I make more profit. If I move slow, I lose money. Simple.
Buyers like that more than you'd expect, because for the first time your incentive and theirs point the same way: done well, done fast.
Here's the script I'd use, word for word:
- 1. "I don't have a day rate." Pause. Let it land.
- 2. "I'd rather we share the risk than you carry all of it." That's the reason, and it's about them.
- 3. "Tell me what you need to be true at the end of this." Now you're talking about the outcome.
- 4. "It'll take about [elapsed time], and the price for that is [fixed price]." When, and how much. Not how many days.
If you'd like to work through this against your own numbers rather than on your own, that's exactly what I do with people. Book a time and bring the last proposal you sent.
When they push for the number of days
They will. A buyer who can't get a day rate will try to work one out. The next question is nearly always "how many days will it take?"
What they're really asking is: help me reverse-engineer your day rate. So don't. Talk about elapsed time, never effort days. "It'll be done in six weeks" tells them when. "It's twelve days of my time" tells them what to divide by.
Clients don't actually care how many hours something takes you. They care when it's finished and whether it worked. The only person who needs to know how many hours it takes is you, so you know you've got the capacity. The moment you share it, you've dragged the conversation straight back to a day rate, and straight back to hired help.
Then comes the classic: "can you do it any cheaper?" I don't negotiate on price. I negotiate on scope. The price is the price. I can do less. Which part would you like to take out? It's a lovely question, because it hands control back to them, and most of the time they decide they'd rather keep all of it.
There is still a day rate. It just isn't the client's business
None of this means you stop knowing what your time is worth. You need that number more than ever.
Anyone who tells you value-based pricing has no day rate behind it is fibbing. Every outcome I've ever priced has a model sitting quietly in the background: this will take roughly this much of my time, so it needs to cost at least this much. Then I look at the value it creates for the client, and if there's a lot more value than cost, there's room to move the price up. If you never connect your time to your money, you have no idea whether you're actually making a profit.
So the day rate doesn't disappear. It moves from the front of the conversation to the back of your spreadsheet. It becomes your floor, not your price.
In practice, keep it simple. I used T-shirt sizes: small, medium and large pieces of work, priced at roughly £5,000, £10,000 and £15,000. Behind each one, I'd check the demand on my time against my private day rate, look at what the work was worth to the client, and land somewhere between the two. Profitable for me, palatable for them.
For the bigger picture on what fractional consultants actually charge, and how to move towards retained pricing, see fractional consulting rates.
What the client is actually buying
Here's the bit that surprises people. When a client asks for your day rate, they're rarely trying to pay less. They're trying to feel safe.
A large insurer once asked me for a day rate on a project. So I gave them two options: a day rate, and a fixed price for the outcome. And I was completely honest with them. The fixed price would not be cheaper.
Then I walked them through what happens on a day rate when things go sideways. If I work hard and finish fast, I lose out. If we discover surprises along the way and it takes longer, you might happily swallow £35,000. Maybe even £40,000. But once it's pushing £45,000 and £50,000, you're not happy anymore, and neither am I.
They chose the fixed price. Not because it was cheaper, because it wasn't. Because it was guaranteed.
The client wasn't trying to cut costs. The client was trying to have cost certainty.
That's the product you're really selling. A day rate can't give it to them. A fixed price can.
The catch is that a fixed price only works if you've done the homework. Before I committed, I knew the scope, the risks and the assumptions, and they were written into the contract. If something changed, we had a very adult sit-down conversation about it. Not "I can't do this", but "I can't do this at that price, because the thing we based the price on turned out not to be true".
I've had that conversation twenty or thirty times over the years. Not once has a client been upset, because the reason was on paper before we started. What goes in a fractional engagement contract covers the scope, assumptions and change terms worth having in writing.
Price the first step, not the whole thing
The easiest way to dodge the day rate conversation altogether is to stop pricing the whole project at the start. Price the first step instead.
Walk into an organisation and say "this will cost £100,000", and watch what happens. It hits the sign-off rules. It hits procurement. It hits audit. And before you know it, a great idea everybody was excited about has drowned quietly in compliance.
Say "the first step is £10,000", and it flies under everybody's radar. That's your paid diagnostic, and its price is set by one thing: can the person in front of you sign it off without asking anyone? In some organisations that's under £5,000. In others, £7,500 to £15,000 is completely normal.
Here's what it looks like in real life. A free 30-minute health check with a private-equity-backed business turned into a two-week diagnostic, priced at £12,000. To give you absolute context, it was four days of my actual work. On a day rate, that's four days. Priced on the outcome, with a clear two-week finish date, it was worth £12,000 to them. And it led straight into a six-month fractional role.
The same trick works at scale. On one project, I could see the whole thing would cost around £700,000, which is a big, scary number for anybody. So I gave them two numbers: the total, and the only one they had to commit to, which was the first £50,000 sprint. If they got unhappy, ran out of budget or just got fed up, they could stop at any point with nothing more owed.
That gave them the confidence they weren't about to get stitched up. The project came in under budget, and they told me it was the first technology project they'd ever done that managed it.
And when procurement does get involved, which in bigger organisations it eventually will, give them something to chew on that isn't your price. I split the paperwork in two. The master services agreement, all the legal terms, goes to procurement, and they can tear it apart as much as they like, because legal, compliance and procurement do love to justify their existence by fiddling with contracts. The statement of work, the bit with the scope and the price, goes to the person who actually wants the work done. Once the master agreement is signed, it lives on, and every new piece of work is just another statement of work. I never have to go back through procurement again.
Small first commitments, priced on outcomes, beat big estimates priced on days. How that first step grows into a full engagement is covered in delivering a fractional engagement.
Retainers are not a day rate in a nice suit
Retainers are the other place the day rate sneaks back in, usually wearing a better outfit.
A retainer is for advice, not for doing the work. Think non-executive director: someone paid to protect and challenge the organisation. I describe it to clients as an insurance policy against making daft decisions. They're paying to have me on demand, as and when they need my judgement.
The moment a retainer starts paying for delivery, it's just a day rate with a fancy name. Avoid it like the plague.
When a client needed both, I kept them apart. For years with one client, I had a retained board-level advisory agreement, and three or four fixed-price pieces of delivery running alongside it, each with its own scope. The advice stayed advice. The delivery stayed delivery. And neither was priced by the day.
When it's your old network asking
The hardest version of the day rate question comes from people who knew you before. A consultant I work with described it perfectly:
"I tell them a day rate, and I get all, like I said, I feel like the ick with it. I hate it. A lot of them will know what I was on in corporate."
That feeling is what pushes good people straight back to a number. A number feels safe. It feels honest. It's neither. It hands the length of the project to a sum, the risk to the client, and your reputation to the plumber.
Your old network deserves the same answer as everybody else, and it's usually easier than you think, because they already trust you. Tell them what the work will deliver, when it'll be done, and what it costs. Then stop talking.
The moment the money question comes up, almost everybody panics. You don't have to. Because the next time someone asks for your day rate, they're not really asking a price question. They're asking two things: how long will this take, and can I trust the number?
Answer those two, and the day rate stops mattering. And once the price conversation stops frightening you, everything about how fractional consultants get clients gets easier.
If you want an outside view on how you price, and how you answer that question when it comes, book a time and bring the number you're most nervous about.
Frequently asked questions
Should a fractional consultant ever give a day rate?
For pure contracting work, where the client is buying your time, a day rate is normal. For fractional work, where the client is buying an outcome or your judgement, a day rate sizes the project before anyone knows the work and positions you as hired help. Keep a day rate as your private floor, not your public price.
What do I say when a client asks for my day rate?
Say you don't have one, calmly, and give the reason: you would rather share the risk than hand all of it to the client. Then talk about the outcome, the elapsed time and the fixed price for the work. Most serious buyers find that more reassuring, not less.
What if the client insists on a day rate?
Offer two options: a day rate and a fixed price for the outcome, and be honest that the fixed price is not cheaper but is guaranteed. Many clients pick the guarantee, because what they want is cost certainty. A buyer who will only accept a day rate is usually looking for a contractor, and that is worth knowing early.
How do I answer "how many days will it take?"
Give the elapsed time, not the effort days. Elapsed time tells the client when it will be done. Effort days only let them divide your price back into a day rate.
How should a fractional consultant price a project without a day rate?
Work out privately what the work will take and what your time is worth, so you know your floor. Then look at the value the outcome creates for the client and set a fixed price between the two. Simple size bands, for example small, medium and large diagnostics, keep it quick.
What happens if a fixed-price project turns out bigger than expected?
Write the scope, risks and assumptions into the agreement before you start. If one of them turns out not to be true, have an adult conversation about the change and its cost. Done that way, clients accept it, because the reason is on paper.
Is a retainer better than a day rate?
For advisory work, yes. A retainer pays for access to your judgement, like a non-executive. For delivery work, use fixed-price pieces of work alongside it. A retainer that pays for execution is a day rate with a different name.